Liquidated Damages

What Does "Liquidated Damages" Mean?

Liquidated damages refer to a predetermined amount of money specified in a contract, payable by a breaching party as compensation for failing to fulfil their contractual obligations. These damages are agreed upon at the time of drafting the contract and are designed to provide certainty and avoid lengthy disputes over actual losses.

Example in Practice

A contractor agrees to complete a project by 31 December. The contract includes a liquidated damages clause requiring the contractor to pay £1,000 for each day the project is delayed. If the contractor finishes the project 10 days late, they must pay £10,000 in liquidated damages.

Why Are Liquidated Damages Used?

Liquidated damages clauses serve several important purposes:

  • Certainty: Establish a clear financial remedy for breaches, avoiding disputes over actual losses.
  • Efficiency: Save time and costs by eliminating the need for complex damage assessments.
  • Encouraging Compliance: Provide an incentive for parties to adhere to their obligations.

Comparison: Liquidated Damages vs Penalties

  • Liquidated Damages: Reflect a genuine pre-estimate of loss and are enforceable in court.
  • Penalty Clauses: Intended to punish the breaching party and are generally unenforceable.

Key Features of Liquidated Damages

  1. Pre-Agreement
    • The amount is agreed upon by both parties at the time of contracting.
    • It must represent a reasonable estimate of potential losses.
  2. Compensatory Nature
    • Liquidated damages compensate the non-breaching party for anticipated losses, not punitive measures.
  3. Applicability
    • Typically used in contracts where breaches can cause measurable financial harm, such as construction, service agreements, or supply contracts.

Legal Framework for Liquidated Damages in the UK

The enforceability of liquidated damages clauses is governed by common law principles established through case law. Key cases include:

Case Name and Citation Facts Outcome Lesson
Dunlop Pneumatic Tyre Co Ltd v New Garage & Motor Co Ltd [1915] AC 79 A tyre manufacturer included a liquidated damages clause in a contract to prevent resale of tyres below a set price. Established that liquidated damages must represent a genuine pre-estimate of loss to be enforceable. Liquidated damages must not be extravagant or unconscionable compared to the actual loss.
Cavendish Square Holding BV v Talal El Makdessi [2015] UKSC 67 A contract included a clause forfeiting payment if a party breached non-compete obligations. Held that the test for enforceability focuses on whether the clause protects a legitimate interest. Legitimate interests of the non-breaching party are key to determining enforceability.
ParkingEye Ltd v Beavis [2015] UKSC 67 A parking operator charged a motorist £85 for overstaying the free parking period in a retail car park. Ruled that the charge was enforceable as it pursued a legitimate commercial interest, not merely punitive. Clauses that serve a legitimate commercial purpose may be enforceable even if they do not represent precise compensation.

Examples of Liquidated Damages in Action

Construction Delays

A builder agrees to complete a housing development by 31 December. The contract specifies £5,000 in liquidated damages for every week of delay. If the project is delivered four weeks late, the builder owes £20,000 in liquidated damages.

Late Delivery in Supply Chain

A supplier contracts to deliver raw materials by a fixed date. A liquidated damages clause imposes £500 per day for late deliveries. A 10-day delay results in a £5,000 penalty under the clause.

Breach of Service Agreement

A marketing agency agrees to deliver a digital campaign by a set deadline. The contract includes liquidated damages of £2,000 for every week of delay. A two-week delay results in £4,000 in liquidated damages.

Challenges with Liquidated Damages Clauses

  1. Excessive or Unreasonable Amounts
    • Courts may deem liquidated damages unenforceable if they are punitive rather than compensatory.
    • Example: A clause requiring payment of £1 million for minor breaches in a £100,000 contract may be invalid.
  2. Difficulty in Estimating Losses
    • Accurately predicting potential losses at the time of contracting can be challenging.
  3. Ambiguity in Clauses
    • Poorly drafted clauses can lead to disputes over their interpretation or application.

Best Practices for Drafting Liquidated Damages Clauses

  1. Ensure Reasonableness
    • The amount should reflect a genuine pre-estimate of potential losses.
  2. Define Trigger Events
    • Clearly specify the breaches that will activate the clause.
  3. Focus on Legitimate Interests
    • Ensure the clause protects a legitimate commercial interest rather than imposing punishment.
  4. Review Regularly
    • Update clauses to reflect changes in circumstances or potential risks.

Legal Documents for Liquidated Damages

Including Liquidated Damages clauses in agreements requires well-drafted legal documents to define terms, prevent disputes, and ensure enforceability. With Go Legal Ai, you can create and customise the following documents:

💼 Simplify Contract Management with Go Legal Ai

Managing liquidated damages clauses can be complex, but Go Legal Ai makes it easy. With our platform, you can:

  • Create clear and enforceable contracts with liquidated damages provisions.
  • Access AI-powered tools to ensure compliance and prevent disputes.
  • Use expert resources to understand case law and industry best practices.
Icon

Easy to Understand

Our documents are written in plain English, avoiding unnecessary legal jargon. This makes them easy to understand and edit.

Create Documents Faster with AI

Customize your documents quickly and accurately with the help of our award-winning Legal AI assistant, streamlining the entire process.

Icon

Up-to-Date

Rest assured that all documents comply with the latest laws, as they’re regularly reviewed and updated by our legal experts.

Icon

On-Demand Legal Support

Get professional advice with our optional lawyer-checking service, ensuring your document is watertight and perfectly suited to your needs.

Liquidated damages are a powerful tool for ensuring accountability in contracts. They provide a pre-agreed financial remedy for specific breaches, saving time and reducing disputes. Below are practical examples across various industries to illustrate how liquidated damages operate.

Examples in Construction Contracts

Project Delays

A contractor agrees to complete a commercial office building by 30 June. The contract specifies £2,000 per day as liquidated damages for delays.

  • Scenario: The contractor finishes 15 days late, owing £30,000 in liquidated damages.

Defective Workmanship

A contract includes a clause imposing liquidated damages of £10,000 for failure to meet agreed quality standards.

  • Scenario: A contractor delivers substandard roofing materials, triggering the clause and requiring payment of £10,000.

Examples in Supply Chain Agreements

Late Delivery of Goods

A supplier contracts to deliver raw materials by 15 March, with a liquidated damages clause of £1,000 per day for delays.

  • Scenario: The supplier delivers 5 days late, resulting in £5,000 in liquidated damages.

Failure to Meet Minimum Order Quantities

A distributor agrees to purchase a minimum quantity of goods each quarter, with liquidated damages of £5,000 for failing to meet this target.

  • Scenario: The distributor falls short by two quarters, incurring £10,000 in damages.

Examples in Service Agreements

Missed Deadlines in Marketing Campaigns

A marketing agency agrees to deliver a digital campaign by a set deadline. The contract includes liquidated damages of £3,000 per week for delays.

  • Scenario: The campaign is delivered three weeks late, leading to £9,000 in liquidated damages.

Failure to Achieve Agreed Metrics

A software provider commits to a service level agreement (SLA) with a 99.9% uptime guarantee. The SLA includes liquidated damages of £500 for every hour of downtime beyond the limit.

  • Scenario: The system experiences 5 hours of unplanned downtime, incurring £2,500 in damages.

Examples in Employment and Consultancy Agreements

Early Termination of Contract

An employee signs a contract with a clause requiring repayment of £10,000 in training costs if they resign within the first year.

  • Scenario: The employee resigns after six months, triggering the repayment clause.

Failure to Deliver Agreed Outputs

A consultant agrees to provide a report by a specified date, with liquidated damages of £1,500 for each week of delay.

  • Scenario: The consultant delivers the report two weeks late, incurring £3,000 in damages.

Examples in Leasing and Real Estate

Breach of Lease Terms

A tenant agrees to vacate a commercial property by a specified date, with liquidated damages of £2,000 per day for holding over.

  • Scenario: The tenant overstays by 10 days, owing £20,000 in damages.

Failure to Complete a Sale

A buyer agrees to complete a property purchase by a set date, with a clause requiring £50,000 in liquidated damages for delays.

  • Scenario: The buyer fails to secure financing on time, triggering the clause.

Lessons from Common Examples

  1. Clarity is Crucial: Ambiguities in liquidated damages clauses can lead to disputes, so contracts should clearly define the trigger events and applicable amounts.
  2. Reasonableness Ensures Enforceability: Damages must reflect a genuine pre-estimate of loss to be upheld in court.
  3. Proactive Monitoring Helps Avoid Breaches: Tracking deadlines and obligations can help parties avoid triggering liquidated damages clauses.

💼 Manage Liquidated Damages with Go Legal Ai

Avoid disputes and simplify contract management with Go Legal Ai. Our platform provides:

  • Custom templates to draft enforceable liquidated damages clauses tailored to your needs.
  • Proprietary AI tools to monitor obligations and prevent breaches.
  • Expert resources to help you understand and manage contractual risks.

What Are Liquidated Damages?

Liquidated damages are a pre-agreed amount specified in a contract, payable by the breaching party to compensate for specific losses caused by the breach. They simplify remedies by avoiding the need to calculate actual damages after a breach occurs.

Why Are Liquidated Damages Included in Contracts?

Liquidated damages clauses are included to:

  • Provide Certainty: Ensure a predictable financial remedy in case of a breach.
  • Avoid Disputes: Eliminate the need for time-consuming and costly damage assessments.
  • Encourage Compliance: Deter breaches by outlining clear consequences.

How Are Liquidated Damages Different from Penalties?

  • Liquidated Damages: Represent a genuine pre-estimate of potential loss and are enforceable in court.
  • Penalties: Aim to punish the breaching party and are generally unenforceable.

Example:

  • A clause requiring £10,000 per day for delayed delivery in a £500,000 project may be valid as liquidated damages if it reflects anticipated losses.
  • A clause imposing £1 million for a minor delay would likely be deemed a penalty and unenforceable.

When Are Liquidated Damages Clauses Enforceable?

To be enforceable, liquidated damages must:

  • Be a Genuine Pre-Estimate: The amount must reasonably reflect anticipated losses at the time of contracting.
  • Protect a Legitimate Interest: The clause should address real concerns, such as project delays or loss of revenue.
  • Avoid Being Punitive: The amount cannot be extravagant or unconscionable compared to the likely loss.

How Are Liquidated Damages Calculated?

Liquidated damages are calculated based on:

  • The potential financial impact of a breach.
  • Losses that are foreseeable at the time of drafting the contract.
  • Agreed figures between the parties during contract negotiations.

Example: In a construction project, liquidated damages may reflect costs such as delayed rental income or additional financing charges.

What Are Common Examples of Liquidated Damages?

  1. Construction Delays: A contractor owes £5,000 per week for failing to complete a project on time.
  2. Supply Chain Failures: A supplier incurs £1,000 per day for late delivery of materials.
  3. Breach of Lease Terms: A tenant pays £2,000 per day for holding over after the lease term expires.

What Are the Benefits of Using Liquidated Damages Clauses?

  • Time-Saving: Eliminates the need to prove actual losses in court.
  • Predictability: Provides clear financial remedies for breaches.
  • Reduced Disputes: Minimises conflicts over compensation amounts.

What Happens If a Liquidated Damages Clause Is Unenforceable?

If a court finds a liquidated damages clause unenforceable, it may:

  • Treat the clause as a penalty and refuse to enforce it.
  • Allow the non-breaching party to claim general damages, which require proof of actual losses.

Example: If a £500,000 penalty clause is deemed unreasonable, the court may award damages based on the proven financial impact of the breach instead.

Can Liquidated Damages Be Capped?

Yes, parties can agree to cap liquidated damages at a maximum amount. This is common in contracts to balance risk and ensure fairness.
Example: A service contract might cap liquidated damages at 20% of the total contract value.

How Can I Avoid Disputes Over Liquidated Damages?

To minimise disputes:

  1. Ensure Reasonableness: The amount should reflect likely losses.
  2. Use Clear Language: Clearly define the breaches that trigger the clause.
  3. Review Regularly: Update clauses to reflect changes in business risks or conditions.

💼 Manage Liquidated Damages Effectively with Go Legal Ai

Simplify your contracts and avoid disputes with Go Legal Ai. Our platform offers:

  • Custom templates for drafting enforceable liquidated damages clauses.
  • AI-powered tools to monitor obligations and track deadlines.
  • Expert insights to help you navigate complex contract terms and avoid penalties.
Founder, Lawyer & Mediator

Karim Oualnan, Partner

Testimonials

Client Reviews

Pricing

Choose Your Perfect Plan

Cancel Anytime. Money Back Guarantee!

Save 30% with annual subscription!

Cancel Anytime. Money Back Guarantee!

Save 30% with annual subscription!

Monthly

Yearly

Starter

Essential templates & services for basic needs

Save up to £3k/Month

£ Free /Month
  • Access to legal templates (3 downloads/month)
  • Free lawyer consultation (30 minutes)
  • Template editor with basic editing tools
  • Access to lawyers & service providers on demand (pay-as-you-go)*
  • 20% discount on services
  • Access to a library of FAQs & legal guides
  • Exclusive partner discounts

*Price depends on service

Live Lawyer Guidance

Free Sign Up Free

Power Up

AI customization for all your legal needs

Save up to £20k/Month

£ 70 /Month
  • Unlimited access to legal templates
  • AI-powered reviews & editing
  • Contextual Legal Ai document upload
  • 2 lawyer consultations/month
  • Priority access to lawyer-checking services
  • 30% discount on services
  • Business Health Check™

Seats included: 1 seat (additional seats at £20/month each)

Live Lawyer Guidance

Unlock Ai Power £70

All Access

Real-time risk tracking & secure team collaboration

Save up to £30k/Month

£ 230 /Month
  • Everything in the Power Up Plan
  • Custom workflows & data
  • Secure team collaboration on documents
  • E-sign documents
  • Bulk document upload & management
  • Insolvency & Claims Tracker™ (real time supply chain risk alerts)
  • 40% discount on services

Seats included: 2 seats (additional seats at £10/month each)

Live Lawyer Guidance

Go All Access £230

Starter

Essential templates & services for basic needs

Save up to £3k/Month

£ Free /Month

Price will depends on service.

MOST POPULAR

Power Up

AI customization for all your legal needs

Save up to £20k/Month

£ 70 /Month

Seats included: 1 seat (each additional seat at £20/month)

All Access

Real-time risk tracking & secure team collaboration

Save up to £30k/Month

£ 230 /Month

Seats included: 2 seats (each additional seat at £10/month)

Starter

Essential templates & services for basic needs

Save up to £36k/Year

£ Free /Year

*Price depends on service

MOST POPULAR

Power Up

AI customization for all your legal needs

Save up to £240k/Year

£ 588 /Year

Seats included: 1 seat (additional seats at £20/month each)

All Access

Real-time risk tracking & secure team collaboration

Save up to £360k/Year

£ 1,932 /Year

Seats included: 2 seats (additional seats at £10/month each)

error: Content is protected !!
Go Legal Ai Icon

Try for Free today

Provide detailed & accurate answers to be eligible, subject to approval.

Easy, affordable legal solutions!

Go Legal Ai Icon

Join as Partner

Complete the form accurately to be eligible, subject to approval

Easy, affordable legal solutions!

Go Legal Ai Icon

Invite & Earn

Earn 10% for paid user you refer!

Complete the form accurately to be eligible

Go Legal Ai Icon

Connect with Clients

Complete the form accurately to be eligible, subject to approval

Be part of an elite network of lawyers

Go Legal Ai Icon

Platform Feedback

Feel free to share as much detail as possible

Help shape legal technology & services.

Best experience

I cannot recommend Mr Karim highly enough! He was clear and cared about his clients and their needs. The level of professionalism and expertise displayed was outstanding.
Thank you

Hanane Bennani

01-11-2024

Our first sponsorship agreement

Karim Helped our company draw up a contract for our first sponsorship of a another party. its hard to find people who are willing to fully help startups but we found that our needs were met and have not only been looked after but our companies protection was key and pivotal in the work process even ensuring to protect aspects we had not considered.

Ikigai

30-10-24

Tackling a tough one

I would highly recommend Karim and his firm who have helped me to address a burdensome banking issue. My legal problem is complex and unique. Karim broke down the situation and left me with a thorough and understandable step by step as to what to do. He took the time to make sure I was able to address the challenges faced and did so in a professional and prompt manner. I will choose Go Legal and Karim again if I have any further complications. Thank you.

Omar

17-10-24

Helpful and sound advice! Great Platform

Karim was really helpful and offered sound advice. It was a godsend to get some good advice after coming up against so many dead ends. Thank you

Carina

26-10-24

Karim has been amazing in helping us...

Karim has been amazing in helping us resolving our legal problems. Go Legal has been a great platform for us. I’m glad we managed to find Karim and his team after speaking to many lawyers he stood out as someone genuine, knowledgeable and always had our best interests in mind. I wholeheartedly recommend Go Legal if you are faced with a legal issue.

Fanous B

05-09-24

I had such an amazing experience using Go Legal Ai

I had such an amazing experience using the Free Consultation service with Go Legal.
I spoke to Karim, and after sharing my situation, he talked me through my options, next steps (which I’m now taking) and was completely assured after speaking with him about the requirements and legalities I need to fulfill (after speaking with lots of other firms who really didn’t help me figure out the best route). I look forward to working more with Karim once the situation develops and paperwork needs to be drafted.

Marisa

25-10-24

Best lawyers

Best lawyers! Karim and Aashma have been amazing. We cannot thank them enough for their hard work and advice throughout our stressful situation! God bless you Karim and Aashma. We have no hesitation in recommending their services.

Harry J

19-10-24

Great professional work

Mr Kareem, was very helpful and collaborative throughout the whole process. He kept us updated on all aspects of the case. Can’t thank him enough for the work he’a done.

Omar

24-10-24

I had a client who didn't pay us...

I had a client who didn’t pay us for three invoices, and we ended up in court. The court’s instructions and communication were terrible, it was too expensive for us to hire a lawyer, and navigating the paperwork was almost impossible. After weeks of frustration, costs, and stress, and after talking to over 20 law firms, we met Karim. He offered a much more affordable and simpler solution, and thanks to him, we won the court case. The Go Legal platform is something that will significantly make life easier for thousands of small business owners, and I am truly grateful that we were lucky enough to meet Karim in this situation

Barbara

16-10-24

Excellent experience

I had an excellent experience working with Karim. He is experienced professional , And during my court case, Karim clearly understood what I needed. he consistently responded promptly and offered clear, expert advice.
I highly recommend them to anyone in need of reliable legal services in London. Thank you karim for your outstanding support

Ilham

16-10-24

Knowledge is Power...

Happy to provide a review….this project has emanated from a foundation of passion rather than from a corporate /business orientation. Given the right financial support and human endeavour, it will emerge as a leading legal platform to support, provide and respond to those in desperate need.
The objectives Karim and his team have set out to achieve is commendable.

Preeti P

07-10-24

How to DIY a complaint against estate agents...

The lawyer advised me how to deal with my complaint myself as it is too small for GoLegal. Very useful but could have been a little slower paced so l coud have taken better notes. But very clear and helpful, thank you..

Mca

15-10-24

Reasonable, fair and trustworthy

They’ve been helping me with many cases and have always been reasonable and fair and acting in my best interests. I used many lawyers before including well known names and they all either scammed me or were negligent. These guys have saved me on more than one occasion and I recommend them without reservations

Mca

20-09-24

Excellent London Solicitors

Good, sound advice with a relatively speedy turnaround without burning a hole in the pocket. We needed a client agreement drafted at short notice with an Addendum that sat on top. Karim understood our requirements and provided expect legal guidance to achieve our objectives as economically as possible.

Would definitely recommend and use again.

Amit

17-09-24

So glad we came across Go Legal AI

So glad we came across this firm and in particular Ms Zareen as her advice and guidance were much needed through a very stressful time. We had a big visa problem that needed immediate action and we found Ms Zareen to be extremely proactive in helping us. Her work process was flawless

AP

19-08-24

Terms & Conditions in no time!

I recently used Go Legal’s platform to create business terms and conditions, and I couldn’t be happier with the experience! The process was incredibly quick and accurate—I had a fully tailored document in no time. What I loved most was how user-friendly the platform is.
The terms & conditions for my business are spot-on and professionally drafted. I felt confident that my business was covered without any unnecessary jargon. Plus, the whole experience felt accessible, with helpful guidance along the way. Highly recommend Go Legal for anyone looking to get quality legal docs in a fast and a lot cheaper way!

Martina

12-09-24

Reliable and Professional Service from Go Legal Ai

I’ve had the pleasure of working with Karim from GoLegal for the third time now, and I can’t say enough about the exceptional service I’ve received. As a startup, it’s crucial to have the right people representing you, and Karim has been a great help in setting up contracts. His expertise and attention to detail have made the process seamless every time. GoLegal has truly been amazing, and I highly recommend them to anyone in need of reliable legal services.

Carolina

12-09-24

Sole parental responsibility ground...

My stepson’s visa application was refused on sole parental responsibility ground and he is turning 18 so we decided to seek help from a professional lawyer and not to risk to apply again by ourselves because it was a critical condition. We worked with Mrs. Zareen Akhtar, a solicitor of the company, and she did her best to achieve a positive result. Fortunately, despite a previous refusal, after just three weeks his second application was successful. Zareen is a perfect professional lawyer and I definitely recommend her to anyone who has a law issue.

Faezeh

03-10-24

Karim and his team have been amazing. Thank you, Go Legal Ai

Karim and his team have been amazing in helping us to resolve a commercial dispute. The advice and approach was clear from our very first call. A dispute that had tourmented us for several years was resolved in a few weeks. From the bottom of my heart, thank you!! We would highly recommend Karim & Go Legal.

Salah

19-08-24

I utilised Go Legal and can only rate my experience with them as exceptional...

I utilised Go-Legal and can only rate Karim and his team as been exceptional.

Karim provided proper costings for our work which involved obtaining an Adjudication enforcement and winding up order against Apollo Builders Group Ltd director Syed Atif Ali.

Karim’s team were very successful and won all court cases. The company is now wound up.

Karim communicated well put in a plan to solve our legal issues and worked hard when our opponent attempted a number of deceitful acts to ruin proceedings.

I would advise going to go legal first before using other teams.

Jays

15-07-24

Karim the best solicitors I've ever seen before

Karim provided exceptional support during a challenging legal issue. His expertise, clear communication, and dedication led to a fantastic outcome. Highly recommend him for anyone needing a skilled and reliable lawyer.

Salah

15-08-24

Thanks so much Karim

Thanks so much Karim! Fast, quick and reliable as always!

Mimi

19-10-24

Easily accessible, very clear, very effective legal advice!

Karim gave me the most effective legal advice I have received in years, in a very clear manner. It is very obvious that Karim understood what I needed, and also knew exactly how to express these in ways that made perfect sense. I was able to make sensible decisions based on his advice. Karim and his Go legal team’s advice and tools being available to me at the right time mean that I can move my business forward efficiently, and with confidence.
I will definitely be using this service going forward!

Olayinka

30-05-24

Can I only give 5 stars?

Very quick first response ✅
Very quick offer of phone chat at a time to suit me ✅
Called when they said they would on a bank holiday ✅
Listened to the numerous issues ✅
Invested over four hours in discussing the issues and my options ✅
Explained everything in ways this creative type could easily understand ✅
Gave clear advice – outlined how they could help and suggested a DIY step I could take immediately ✅✅✅
Thanks Karim!
Can I only give 5 stars!

Ian

02-04-24

Exceptional work from Karim!

Karim went above and beyond to help us settle a debt dispute with a UK company that hadn’t paid us. As an international business, Karim was tremendously helpful and available to us throughout the process, even with time zone differences across our offices. We really appreciated the extended effort he took to tailor our needs! I very much look forward to working with him again and couldn’t recommend Go Legal more. Thanks so much again Karim!

Kaela

09-12-23

Highly Recommended Karim at Go Legal Ai

After months of struggling with a rather shady company and getting nowhere, I was recommended to speak with Karim at Go Legal. He was incredibly reassuring, listened to my complaint attentively, and clearly presented my options. Within a few weeks of negotiations with the opposing lawyer, Karim was able to secure a fantastic settlement for me. I was over the moon! He is calm, reassuring, and responsive. I highly recommend Karim at Go Legal to anyone in need of a good lawyer.

Lee

28-06-24

Karim thinks outside the box

Karim thinks outside the box. He has knowledge, experience and common sense. His main concern is the outcome for his client, rather than what others think the outcome should be. He challenges the status quo and gets the results.

Galina

30-05-2024

Best Lawyer Team!

I cannot speak highly enough of Karim and his team. Their dedication to their clients and attention to detail are truly remarkable. From start to finish, they demonstrated professionalism, expertise, and a genuine commitment to achieving the best possible outcome for my legal needs. I have worked with many lawyers in the past, but none have compared to the level of service and expertise provided by Karim and his team. If you’re looking for the best lawyers around, look no further. I wholeheartedly recommend them to anyone in need of legal assistance.

Digilency

26-05-2024

Honest, Transparent, Knowledgeable...

Karim sounded out my case as a free consult. I was extremely grateful to him for his honesty, integrity and wealth of knowledge. Highly recommend.

Digilency

23-08-2024

Recently had the opportunity to use Go Legal Ai

Recently had the opportunity to work with Karim and I can say that my time was worth it. Karim is someone who takes care of things instantly with constant attention to detail and perfection and the right person to work with in legal matters

Derin

12-07-2024

Amazing DIY legal platform

Karim, is personable and professional. He has a real desire to deliver the best outcome for your case. His attention to detail is next to none and constantly keeps you in the loop as a client. I trust his judgement and can’t recommend his services enough as a legal professional. You are in safe hands.

Jason

17-01-2024

Excellent Service

I have known Karim for many years and his work ethic and professionalism is excellent, similalrly throughout the team he has selected around him. His passion for his work is clear from all interactions with him and he transmits this through the quality of his work.

J A

07-07-2024

Excellent Service

Excellent service, esp from Atty Zareen. My husband’s visa was granted because of her hard work. She is very focused and gives regular updates.
I would use their service again.

Joel

21-06-2024

Karim and Aashma at Go Legal Ai

Karim and Aashma were brilliant in the way they advised us on the process during a difficult and stressful time. I can’t thank them enough for they help on the legal matter.

Darren

06-08-2024

Great work by Karim

Top of the line work done and executed by Karim. He has went out of his way in helping me settling down a lot of things in the UK. He has been helpful to us in many ways and really appreciate the effort done by him. Thank you very much, will be looking forward to get in touch again whenever there’s a legal work required. Highly Recommended firm

Darren

10-12-2023

I loved Go Legal Ai because I felt I could...

I loved Go Legal because I felt I could deposit my trust on them and they guided me through all the possibilities and process. Feeling informed made the journey more relaxed. They are very professional, empathetic and human! A rare combination nowadays. Thanks for your great work! I highly recommend.

Irina

09-01-2024

Karim's expertise and tutelage

Karim, with his sound experience in settling complex disputes, supervising that the agreements are right for you and most importantly analysing legal documents to know if you have a foot to stand on in your pursuit for justice and holding a strong case. I couldn’t recommend a more better person to help you with your needs.
Go-Legal is the way to go!

Calvin

08-12-2023

Unrivalled experience

Incredible service! He’s meticulous and most importantly doesn’t leave any stone unturned. His wealth of knowledge and experience gave me assurance and peace of mind when going through our litigation process and Karim was swift in his process from start to finish. His personable approach has made it a truly unrivalled experience!

Jay

11-05-2024

First Solicitor Firm I feel I can trust

For the first time in the last 7 years I spoke to a professional who WAS LISTENING to me so to best understand – in the short time available – what is going on and why I need to take my ex-solicitor to court.
It would feel right to have GoLegal help me with the professional negligence case, if time limitations allow to do so. Pity I did not speak to this Firm, months ago. Wow, they know what they are doing…
Conversation ended on such a positive note, thank you K. from GoLegal, thank you very much.

meS P

21-02-2024

Highly recommend Karim and his team

Highly recommend Karim and his team. It is our second time using Go Legal and we are very pleased with the result and service which continues to surpass expectations. Brilliant!

Sean

24-06-2024

I highly recommend Karim and his team!

I highly recommend Karim and his team!! I cannot recommend him highly enough. In all my years haven’t come across a better or more knowledgeable lawyer. We are grateful for his assistance and compassion.

Mesfin

23-02-2024

Karim and his team went above my expectations...

Karim and his team went above my expectations. He us diligent, sympathetic and most of all knowledgeable. His approach is very thorough and I would not hesitate to recommend him. Thank you Karim!

Miria

30-05-2024

Excellent all round

I recieved a free consultation call bang on the time agreed, from Karim, who was friendly and very professional. He listened well to all had to say, and though he couldn’t assist in this case has advised me and even sent me a link after to alternative help. Thank you Karim. A great appreciated service all round

Hannah

18-01-2024

Highly recommended for exceptional service

Karim and his team are very helpful. I mostly liked the free consultation service they offered. It helped me a lot to understand what I needed. I contacted them for immigration service and they provided an exceptional solution.

Iftekhar

09-05-2024

Karim provided a great service...

Karim provided a great service and allowed me to understand the process much more. All cases have a tremendous amount of moving parts which were well explained. Recommended.

DPM Construction

18-06-2024

Karim is very knowledgeable in his field. Great Platform

Karim is very knowledgeable in his field, gives great advice and most importantly is very easy to communicate with.

Speaking with some solicitors can be an intimidating process but Karim’s easy going approach is a breath of fresh air.

Highly recommended!

M S

02-06-2024

Excellent experience with Karim at Go Legal Ai

Excellent experience with Karim.
He was very helpful, polite and an excellent communicator. He is competent and professional
and responded always very quickly to our questions.
We highly recommend Karim.

RS

30-09-2024

Right from the start I knew we were in safe hands with Go Legal Ai

Right from the start I knew we were in safe hands, we had a consultation with Karim and discussed our case with him. We were given a clear strategy at the outset and everything panned out as he predicted. I cannot recommend Karim enough for any legal matter.

Sam

09-01-2024

Karim helped us resolve a commercial dispute...You're in safe hands

Karim helped us resolve a commercial dispute. I would highly recommend him. He’s very competent and caring throughout the process. And involved us in the decision making to get a successful outcome. You’re in safe hands.

May

08-12-2023

Best legal platform for all your legal needs

We have used several lawyers over the years Karim has been the best! He is passionate and has genuine intention to help clients get the best outcome. Always available for us whenever we need his help

Yousuf

08-12-2023

Excellent platform

Many thanks for your excellent work on my behalf, I extremely appreciate your help. You were so thorough, persistent, fair and transparent. I shall always say, I had the best possible solicitor to fight my cause. Thank you!

Evgenia

09-12-2023

Excellent legal support and advice

Karim has assisted in commercial ligitation. He was very helpful, pro active support and gave detsiled advice. I will be using their services in the future for all of my legal requirements.

Asim

24-05-2024

Grateful for an amazing DIY legal platform

We are grateful to Karim who helped our small business recover a debt within a few weeks. Very attentive even outside of normal working hours. Thank you so much!!

Gazi

26-01-2024

Impressive and exceptional service

I recently had the pleasure of working with Karim from Go Legal, and I am beyond impressed with the exceptional service I received. From the very first consultation, it was clear that Karim is deeply knowledgeable and genuinely invested in understanding every aspect of my case. His compassion and dedication to his clients are truly unparalleled.

If you’re looking for a legal firm that combines expertise with a personal touch, look no further than Go Legal. Karim and his team are truly a standout in their field, and I wholeheartedly recommend them to anyone in need of legal assistance. Their dedication to their clients’ well-being and their unwavering pursuit of justice make them an invaluable ally in any legal matter.

Raj

09-07-2024

Professional and very friendly legal platform

Karim, is very friendly and professional. We reached out for advice and process for what we believed was a contract breach issue.

Karim demonstrated a great understanding of contract law and provided invaluable guidance every step of the way – from our initial consultation to the resolution of the matter,

They took the time to thoroughly review the details of my case, patiently answered all of my questions, and provided clear and concise explanations of my options.

Thanks to their expertise, the contract breach issue was resolved efficiently and favourably.

I wholeheartedly recommend Karim to anyone in need of legal assistance. Their professionalism, expertise, and genuine care for their clients truly set them apart. If you’re facing a contract breach or any other legal challenge, look no further.

Samantha

15-04-2024

Honestly the best solicitors

Karim and his team are a god send. We have been dealing with a breach of contract construction dispute for several months which has caused us stress and anxiety. Karim was able to resolve it for us in a few weeks. Honestly the best lawyers I have come across. Diligent and well thought out advice.

Dominic

15-04-2024

Excellent all round!!!

Karim Oualnan at handled a contractual case to a successful resolution. Karim was diligent, always providing great, honest advice in which Karim always put my best interests at the forefront of his suggestions during the case. He is very reliable, trustworthy and always on hand to help. I would highly recommend Karim and look forward to working with him again in future.

Derrick

15-01-2024

Karim is a standout lawyer!

Karim is a standout lawyer! His approach is very strategic and always has the best intentions of the client in mind throughout. I would highly recommend him if you’re looking for a lawyer. You’re in safe hands!

Ceren O.

09-01-2024

Karim is an incredibly meticulous and astute lawyer!

Karim is an incredibly meticulous and astute lawyer who applies a high level of skill and intelligence to his work. There is no one else that I can think of who I would go to solve a commercial dispute due to his ability of solve problems and see the commercial angle and importance of legal issues. As is evidenced by his career so far he is very comfortable with leading on complex matters and you can trust that he will produce an excellent quality of work. He is also incredibly personable, diligent and hard-working.

Ross

13-12-2023

Karim was amazing

Karim was amazing, quick and effective just what you need. Very professional and makes it easy for you to understand everything. Always there when we need help and times of need. Worth every single penny!

Ant

09-05-2024

Absolutely super service and platform!

I received follow up legal advice from Karim that was extremely helpful and really helped me to clarify my situation and decide on my case progression

Absolutely super service.

Paul

09-07-2024

Very reactive and called within minutes. Great platform

Very reactive and called within minutes. Offered us lots of great advice which he didn’t need to offer up for free. Would recommend

Sonny

19-02-2024

Highly recommended

I have known Karim for several years and have nothing but praise for the way he conducts himself professionally. He is an outstanding Litigation Solicitor dedicated to achieving the best solutions for his clients. He is highly recommended

Khurshid

04-07-2024

Great Advice!

I recently worked with Karim at GoLegal and couldn’t be more pleased with the service I received. He provided exceptional advice regarding trademarks and offered valuable business insights. His expertise and thoroughness were evident in every interaction. I highly recommend Karim and GoLegal for anyone seeking professional and insightful legal guidance.

Kyle

30-05-2024

Professional, highly recommended

Thank you so much Karim for your Legal advice
Professional, friendly and helpful
I cannot be more grateful

Highly recommended

Angie Jo Fitness

17-01-2024

Legal Advice

It was astounding how much legal knowledge and experience Karim and the team possessed. They gave good legal advice and handled complicated legal matters with ease. Their handling of delicate situations with professionalism was admirable.

Jabel

26-05-2024

Go Legal Ai

Go-legal Ai has very professional and well mannered people who work hard to make sure your enquiries are dealt with as soon as possible.

Mar

20-02-2024

Second to none - Amazing!

Having spoken to multiple solicitors in the past few weeks I was at wit’s end, I was just as low as could be until I found Karim who gave me the confidence to keep going, his knowledge of my predicament was second to none.

James

19-06-2024

Karim gave me valuable advice and was very helpful

Karim gave me valuable advice and was very helpful
when i was unsure weather to pursue a claim for a Construction contractual dispute.

Jon

28-05-2024

Amazing service and experienced staff at Go Legal Ai

Amazing service and experienced staff. Help and advice was top quality and especially recommend Karim as giving a level of quality service above expectations. Thank you

Abdul

04-07-2024

Amazing service

Amazing service! He’s thorough and ensures no detail is overlooked. With his extensive expertise, he provided me with confidence and reassurance during our legal proceedings. Karim was efficient from beginning to end, and his friendly demeanor made it an unparalleled experience!

Zubair

12-05-2024

Karim was able to offer us some great advice

Karim was able to offer us some great advice in consultation. Very knowledgeable and considerate. Thank you Karim.

Sophie R

23-03-2024

Highly recommended lawyers

I highly recommend Karim as a commercial solicitor. While he worked on my matter, I was extremely impressed with his expertise, professionalism, and client-focused approach. He is a trusted advisor who will provide you with the expert legal advice you need to make informed decisions.

Remi

12-12-2023

Amazing in every way

I recently sought legal representation for a challenging litigation case and go-legal exceeded my expectations in every way. From the initial consultation, it was clear they were experienced and truly invested in getting the best outcome for me.

Karim, was particularly exceptional. His profound knowledge of the law and insightful strategies were invaluable throughout the process. He kept me informed, addressed all my concerns with patience and clarity, and consistently demonstrated genuineness.

Another massive thank you

SB

08-01-2024

5 stars!!

Karim and his team have been excellent in helping our company navigate the regulatory environment in the online competitions and gaming sector. His legal expertise has been invaluable in recent months, and we’re extremely grateful for his knowledge and support.

Liam

16-08-2024

Thanks from core of my heart!

I am writing to express my deepest gratitude for the service Ms.Zareen provided in securing the approval of my child’s Dependent visa following the initial refusal.

From the very beginning, her dedication and professionalism were evident. She took the time to thoroughly understand our situation, meticulously reviewed all the documents, and provided clear, concise guidance on the necessary steps to strengthen our case. Her expertise and strategic approach played a vital role in overturning the refusal.

I particularly appreciate how she maintained clear and constant communication, ensuring we were informed and reassured throughout the process ,showed remarkable attention in preparing our documents & displayed genuine compassion and understanding, which made a stressful situation much more manageable.

Thanks for her hard work and expertise.
We are incredibly grateful for the positive outcome.
Her efforts have had a profound impact on our lives, and we cannot thank you enough.
I will wholeheartedly recommend the services to anyone in need of immigration assistance, knowing they will be in the best hands.

Shah

04-08-2024

Thanks from core of my heart!

I am writing to express my deepest gratitude for the service Ms.Zareen provided in securing the approval of my child’s Dependent visa following the initial refusal.

From the very beginning, her dedication and professionalism were evident. She took the time to thoroughly understand our situation, meticulously reviewed all the documents, and provided clear, concise guidance on the necessary steps to strengthen our case. Her expertise and strategic approach played a vital role in overturning the refusal.

I particularly appreciate how she maintained clear and constant communication, ensuring we were informed and reassured throughout the process ,showed remarkable attention in preparing our documents & displayed genuine compassion and understanding, which made a stressful situation much more manageable.

Thanks for her hard work and expertise.
We are incredibly grateful for the positive outcome.
Her efforts have had a profound impact on our lives, and we cannot thank you enough.
I will wholeheartedly recommend the services to anyone in need of immigration assistance, knowing they will be in the best hands.

Shah

04-08-2024

Went above and beyond

Karim was easy to work with. Slight communication hiccup at the start, but more than made up for it with the work he did on my case. Happy with the outcome.

Jake

04-06-2024

Absolutely amazing

Karim has been so so great, he helped me throughout the whole process and even after. 100% recommended

Kd

17-06-2024

Karim has been absolutely amazing

Karim has been absolutely amazing, really helpful and responses were always really fast. I would 100% go back!

Kd

01-03-2024

Exceptional legal expertise and compassionate support

I am extremely pleased with the legal services provided by Karim and his team. Their expertise, professionalism, and prompt communication made a significant difference in my case. I also appreciated your display of empathy and understanding during a potentially stressful period for me. Your compassionate approach was truly valuable – a massive bonus for me personally. Highly recommended!

Justin

09-12-2023

Karim provided exceptional service

Karim provided exceptional service, demonstrating a high level of professionalism and competence. He was thorough, responsive, and always ensured that my needs were met promptly and efficiently. His expertise and attention to detail were evident in every interaction, making the entire process smooth and stress-free. I highly recommend Karim for his outstanding service and dedication to excellence.

TW

01-06-2024

Karim is an immaculate professional

Karim is an immaculate professional, going above and beyond to excel in his service. Couldn’t recommend highly enough!

Aman

11-12-2023

Exceptional service from Go Legal Ai

Karim was exceptional at providing me advice to my matters. He was attentive, knowledgeable and approachable. Moreover, GoLegal is a great platform for open-sourced legal information.

Antonio

30-04-2024

Go Legal Ai helped me a lot!

The owner of Go Legal helped me with the process of filing a pre-action protocol proforma and it went smoothly. I totally recommend their professionalism and also dedication.

Muizz

08-12-2023

Karim is an amazing asset to have in your corner

Karim is an amazing asset to have in your corner. Can’t recommend him and his team enough

Thomas

03-06-2024

Karim was extremely helpful and knowledgeable!

Karim was extremely helpful and knowledgeable.
Gave me sound advice on what I needed to do.

Steve

19-01-2024

Very helpful and informative

Very helpful and informative. Takes the time to address the details

Gotch

19-07-2024

Very helpful and friendly platform...

Very helpful and friendly impartial advice. Extremely thankful for the patience and time.

Louis

31-01-2024

Karim had exceptional dedication

Karim had exceptional dedication, a positive attitude and provided very helpful guidance. He constantly went above and beyond in every aspect.

Andre

08-12-2023

Great advice from the start

Great advice from the start, completely understanding & happy to discuss anything that your unsure about concerning

Robert

16-01-2024

Fantastic service given and a lot of help

Fantastic Service given and alot of help regarding ex business partner/supplier giving harassment and defamation. A cease and desist letter was recommended to resolve the issues. Definitely recommended.

Nick

17-06-2024

Exceptional platform and service throughout!

Exceptional service throughout the whole process. The information and advice provided was first class and exceeded my expectations.

Gavin

17-06-2024

I am delighted to share my heartfelt gratitude!

I am delighted to share my heartfelt gratitude and utmost appreciation for Zareen, the immigration consultant who expertly guided us through the British naturalisation process for my wife and two kids. From start to finish, Zareen’s exceptional service and unwavering confidence made an enormous difference in our journey.

Zareen’s expertise and professionalism were evident from our very first meeting. She thoroughly understood the complexities of our case and approached each challenge with a calm and positive demeanor. Her extensive knowledge of the naturalisation process and her ability to anticipate and address potential issues reassured us every step of the way.

What truly set Zareen apart was her constant communication and feedback. She kept us informed about the progress of our application, providing timely updates and constructive insights that helped us stay on track. Her positive attitude and encouraging words were a source of comfort, especially during moments of uncertainty.

Zareen’s dedication and meticulous attention to detail ensured that all our documentation was accurate and complete. Her proactive approach in preparing and submitting our application demonstrated her commitment to achieving the best possible outcome for our family.

Thanks to Zareen’s exceptional guidance, we successfully obtained British naturalisation for my wife and two kids. Her professionalism, confidence, and unwavering support made an otherwise daunting process smooth and stress-free. I wholeheartedly recommend Zareen to anyone seeking an immigration consultant who genuinely cares about her clients and delivers outstanding results.

Thank you, Zareen, for your outstanding service and for helping our family achieve this significant milestone. We are forever grateful for your expertise and support.

Aziz

09-07-2024

Professional and reliable

Karim is knowledgeable and very attentive in all details ensuring the process goes smoothly and transparent, Also very professional and reliable, throughout the process making it easier and more prompt, I definitely recommend it 🌟🌟🌟🌟🌟🌟

Rosana

17-05-2024

Excellent to have warm personable help!

Excellent to have warm personable assistance

Clare

16-10-2024

Thank you for the help!

Would highly recommend for drafting any contractual documents. Stand out firm

Ash

08-12-2023

Exceptional!!

Called in for information regarding my dissertation on civil law and was kindly provided with very useful information.

Ella

05-05-2024

Thank you Go Legal Ai!

Since I was in need of a lawyer, Karim was my go to. He was really listening to me and I felt heard. Thanks for your help

S D

02-03-2024

Great Platform!

karim gave me a call back and gave me advice on what I should do. Thank you

A Khan

12-03-2024

Very helpful!

Very helpful! Thanks Karim

MJ

26-06-2024

Free Consultation!

He listened and provided very good advise

Sola

04-07-2024

Recovered money for dispute

Great platform. Thank you Go Legal Ai

Maria

08-08-2024

Very caring and professional company

Very caring and professional company…

LJohn

12-05-2024

Need help? Start chatting with a real lawyer for quick, personalized advice.

price table popup 2

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus

price table popup 1
Go Legal Ai Icon

Affordable Legal Help – Anytime You Need It

👋 Solve your legal issue today!

How can we help?

milestone icon

Legal Pathway

letter template icon

Free Templates

document review icon

Document Review

ai technology icon

Ask Go Legal Ai

lawyer icon

Book Lawyer Call

📄 5,000+ legal templates, 150+ jurisdictions!🌍